Overview
The Northwest Area Mill and Overlay Project includes:
- Thye Parkway from Lockwood Drive to Eveleth Avenue
- Quie Lane from Lockwood Drive 650 feet west
- Rolvaag Court
- Lupine Drive from Eveleth Avenue to Cannon Valley Drive
- Lupine Court
- Cannon Valley Drive from North Avenue 1,450 feet north
- Woodland Trail
- Greenleaf Court
- Wildwood Court
- North Avenue from Eveleth Avenue to Summerfield Drive
- Juniper Avenue from Lincoln Street to Lincoln Parkway
- Joann Court
- Headley Court
- St. Olaf Avenue from Lincoln Street to Highway TH 3
- Forest Avenue from Lincoln Street to Odd Fellows Campus
In addition to the proposed street surface improvements, the City of Northfield will also analyze improvements to the adjacent walking, biking and pedestrian infrastructure.
Final construction plans (PDF)
Location
Phase 1
Phase 2
Timeline
May 2, 2022 through September 2022.
Feasibility study
The process began with the Northfield City Council ordering a feasibility study on May 4, 2021. The feasibility study examines the proposed street and utility improvements along these street corridors to determine whether the project – as proposed – is feasible, cost effective and necessary.
Project process
The project process is the actions the City of Northfield utilizes for local improvements during project development. This step by step process includes opportunities for City Council and residents to provide input on the proposed project.
Project process (October 26, 2021)
Meetings
January 5, 2022 Neighborhood Meeting #2
6:30 p.m. to 8:00 p.m. Greenvale Park Elementary School
Neighborhood Meeting Letter #2
July 14, 2021 Neighborhood Meeting #1
5:30 p.m. to 7:00 p.m. Greenvale Park Elementary School
Neighborhood Meeting Letter #1
Sign up for updates
Stay informed on project progress and engagement opportunities.
Sign up for email or text updates
Updates
-
Sean Simonson
Engineering ManagerPhone: 507-645-3049
-
-
“Be the Solution to Stormwater Pollution” Poster Contest 2023 winners
Zaya Detert (grade 2 and 3) and Laurel Benson (grade 4 and 5) won first place in the 2023 “Be the Solution to Stormwater Pollution” Poster Contest. Students from all five Northfield elementary schools submitted 171 posters for the contest. Stormwater poster... -
Highway 3 signal improvements
Project will begin the week of May 1 on Highway 3 from Second Street in Northfield to Hester Street in Dundas. It includes adding emergency vehicle traffic signal preemption, flashing yellow left turn signals, and replacing standard lighting with LED. Signal improvements...